Work to update the London offices of Green Investment Bank PLC was completed in December 2015. It included a cat B refurbishment and reconfiguration of the 5th and 13th floors of Millbank Tower, Pimlico.
Work to update the London offices of Green Investment Bank PLC was completed in December 2015. It included a cat B refurbishment and reconfiguration of the 5th and 13th floors of Millbank Tower, Pimlico.